Road Closure A6 northbound from Oakley to Milton Ernest

16.11.26 – 15.12.26 during the hours of 20:00 and 06:00 - Notice on works to resurface the A6 from Milton Ernest to Paula Radcliffe Way, and repair the surface water drainage system.

Date Published: 18/11/2026

Road Closure A6 northbound from Oakley to Milton Ernest

16.11.26 – 15.12.26 during the hours of 20:00 and 06:00

Notice on works to resurface the A6 from Milton Ernest to Paula Radcliffe Way, and repair the surface water drainage system.

Paula Radcliffe Way will be closed northbound from the last Oakley junction to Bedford Road, to include the slip road from Oakley to prevent traffic accessing Paula Radcliffe Way. Resident access is maintained via Oakley.

Signs will be put up at the ends of the site which will provide the most up to date information if the programme changes. A diversion route via A428, A509, A45 and A6 will be in place during the hours of the road closure.

These works are essential due to the failing condition of the road and urgency to enable it to survive the winter.

There will be no through route during the works for the safety of operatives and the public. Works will be undertaken overnight Monday to Friday to reduce disruption to road users. Gatemen will advise on site.

Access to Thurleigh Business Park and Twinwoods Park will be possible from the north via the roundabout with Mill Road and Thurleigh Road. Entry for Bedford along the A6 will not be possible. The diversion will need to be followed.

This is phase 1 and a second phase will follow after Christmas - dates to be confirmed. This will mean the A6 will be closed from Milton Ernest to The Avenue, Bletsoe, details to be confirmed nearer the time. Through traffic will not be possible.

Telephone the Highways Helpdesk on 01234 718003 or email highways.helpdesk(at)bedford.gov.uk with any queries.

DOWNLOAD PDF